CUF Torres Vedras Hospital will be expanded
The intervention includes a major expansion on all floors, diversifying and increasing the hospital’s capacity, with approximately 3,000 m² of gross area.
The architecture project is being carried out by the Intergaup, which was also involved in the original project.
In this intervention, Projectual will be responsible for developing the design of foundations and structures, as well as the excavation plan and peripheral containment, which involves the rehabilitation and expansion of the existing structure, also carried out by Projectual.